2023: Expansion of photovoltaic systems
Following an inventory of all energy-relevant data, our external energy consultants provided us with a 73-page report outlining 24 energy efficiency measures.
Following the digitalisation of all building plans and an inventory of all energy-relevant data, our external energy consultants provided us with a 73-page report outlining 24 energy efficiency measures – 19 for Güglingen and five for Amorbach. The estimated total costs amount to 770,000 Euros. We prioritised these measures and planned their implementation within a period of six years.
Already implemented:
- 2023: Installation of a 162 kWp photovoltaic system on the roof of the operating resources building and on the administration, technical and laboratory buildings at the Güglingen plant.
- 2024: Expansion of the photovoltaic system at the Amorbach plant with an additional 181 kWp.