Environmental protection investments
Major environmental protection investments at a glance:
2022
- Drip pan for recycling centre
 - Charging facility for electric cars
 - LED lighting
 - IT module for paperless logistics department
 
2021
- Photovoltaic system 413 kWp
 - Sprinkler system in logistics centre
 - Renewal of roof with heat insulation in plastic injection moulding and tool design building
 
2020
- LED lighting in plastic injection moulding building for teams 1 and 2
 - Automatic window control for optimised ventilation for teams 3 to 6
 - Installation of fire alarm system in the plastic injection moulding plant, assembly, logistics, laboratory and technology
 
2019
- LED lighting for assembly 1, stationary gas analysis and tool design
 - New water treatment for cooling water in the plastic injection moulding plant
 - Replacement of heating circuit pumps with energy-saving pumpsn
 
2018
- Fire alarm system in the production area
 - LED lighting for car park area of administration department
 - New compressed air system in assembly
 
2017
- Reduced paper consumption thanks to SAP
 - LED lighting in the technical building and canteen warehouse
 - Replacement of pneumatic screwdrivers by electric screwdrivers
 - Fire protection panels in the forklift charging area
 - Technical overhaul of fire protection doors
 
2016
- LED lighting for goods receipt, dispatch, technology and outdoor facilities
 - Circulation system for test bench for temperature changes
 - Full renewal of the compressed air lines in the assembly area
 - Replacement of pneumatic screwdrivers by electric screwdrivers
 
2015
- Energy audit DIN EN 16247-1
 - New insulated glazing windows in service department
 - Conversion of the operating instructions to a new format
 - Conversion to LED lighting in various areas
 
2014
- Study "Energy Efficiency"
 - Solar thermal energy system for service water
 - Photovoltaic system 105 kWp
 - Conversion to LED lighting in passageways and outdoor areas
 
2013
- Underfloor heating system in new training room
 - Rainwater cistern 20,400 litres
 - Conversion of lighting in preproduction (new light colour with mirror -> 50% energy saving)
 - Two permanently installed measuring systems for measurement of consumption of compressed air
 - Measuring system for measuring and optimising the energy consumption of plastic injection moulding machines
 - Measuring system for detecting compressed air leaks
 
2012
- Tightness test of all wastewater pipes
 - Hydraulic balancing of the entire heating system with Vario-Q valves
 - Insulated glazing windows in the intermediate building of the production hall
 
2011
- Downhole heat exchangers
 - Underfloor heating system Lindenstraße 33
 - Glazed entrance elements Administration
 - Fire protection measures
 - Fire alarm system laboratory and technology
 
2010
- Photovoltaic system 61 kWp
 - Fire protection door
 - Gas analyser for containers
 - Outdoor silo for granular plastics
 - Partition wall in goods receipt
 - Heat insulation of facade of assembly hall
 
2009
- Photovoltaic system 171 kWp
 - New windows in the staircase
 - New roof with heat insulation in Amorbach
 
2008
- New roofs and windows for technology and administration buildings
 - Heat insulation of facade of administration building
 - New insulated heating pipes between brick building and technology building
 - Solar system for hot water on the roof of the plastic injection moulding plant
 - Smoke and heat extraction system in staircase of administration and technology buildings
 - New compensation system in transformer station plastic injection moulding plant
 - Fire protection measures
 
2007
- Redesign and recultivation of the outdoor areas
 - Flood protection in the area of the production hall
 - Smoke protection and smoke detectors in the tool store II
 
2006
- Replacement of single glazing by insulating glazing in the "tools and equipment making" hall
 - Replacement of all basement windows by windows with insulating glazing
 - Reporting the water levels of the Zaber river with the web-based event reporting system EMS 442
 - Replacement of powder extinguishers by foam extinguishers
 
2005
- Flood protection through earthmoving along the course of a brook
 - Flood protection with sheet piling retaining walls at all doors and gates at risk
 - Installation of surveillance cameras at recycling centre
 
2004
- Heating of the office extension through heat recovery from the compressor system
 - Replacement of the cooling tower by a closed circuit cooling system for the plastic injection moulding plant
 
2003
- Expansion of the fire extinguishing system
 - Energy savings with new granulate dryers
 
2002
- High-speed doors in the production halls
 - Saving paper through electronic archiving
 - Reduced water consumption due to installation of a recirculation system for laboratory tests